实时快讯
政策法规 现行有效新加坡清关税务

102025 IMPLEMENTATION OF ELECTRONIC ORIGIN DATA EXCHANGE SYSTEM (EODES) BETWEEN SINGAPORE AND CHINA UNDER THE REGIONAL COMPREHENSIVE ECONOMIC PARTNERSHIP (RCEP) AND THE APPLICATION FOR CERTIFICATE OF

效力法规类型发布日期生效日期发文机构
现行有效规范性文件2026-06-262026-06-26Singapore Customs
发布06-26
生效06-26
摘要总结AI 辅助解读
新加坡海关通告10/2025(2026年6月26日更新)宣布,自2025年12月11日起,电子原产地数据交换系统(EODES)正式扩展至RCEP框架下的中新贸易。进出口商可通过Customs eServices直接接收或提交电子优惠原产地证书(e-PCO),无需再依赖纸质单据进行关税优惠申报。同时,通告明确了非操纵证明(CNM)的申请流程、费用及IBG支付要求,并更新了相关操作指引链接。建议相关企业核实账户权限及操作流程变更。
官方原文
外文原文 · 可AI翻译 · 可溯源

Singapore Customs

55 Newton Road #07-01

Revenue House

Singapore 307987

Tel: (65) 6355 2000

E-mail: customs_roo@customs.gov.sg

www.customs.gov.sg

Circular No: 10/2025 5 Dec 2025

(updated 26 June 2026)

Manufacturers, Traders and Declaring Agents

Dear Sir/Madam

IMPLEMENTATION OF ELECTRONIC ORIGIN DATA EXCHANGE SYSTEM (EODES) BETWEEN

SINGAPORE AND CHINA UNDER THE REGIONAL COMPREHENSIVE ECONOMIC PARTNERSHIP

(RCEP) AND THE APPLICATION FOR CERTIFICATE OF NON-MANIPULATION (CNM) ON CUSTOMS

E SERVICES

Established since 1 November 2019, the EODES enables the electronic submission of

Preferential Certificates of Origin (PCOs) under ASEAN-China Free Trade Area (ACFTA) and China-

Singapore Free Trade Agreement (CSFTA), as well as the Certificate of Non-Manipulation (CNM)

between Singapore Customs and China’s General Administration of Customs (GACC).

2 With effect from 11 December 2025, Singapore based companies importing from, and

exporting to China using PCOs under the Regional Comprehensive Economic Partnership (RCEP)

will also be able to use the EODES to receive and submit electronic PCOs.

3 Companies should only rely on the electronic transmission of PCOs for preferential tariffs

claims as GACC had implemented full transmission of e-PCO since 1 May 2020.

Procedures for e-PCO submission for Export to China

4 The TradeNet declaration procedures for a PCO for exports to China remains the same.

Once the PCO is approved in TradeNet, the next steps are as follow:

a. The exporter or its authorised declaring agent(s) can retrieve the approved PCO

via www.customs.gov.sg > eServices > Search for “Electronic Preferential Certificate of

Origin transmitted to The People’s Republic of China” > Outbound enquiry > Submit SG PCO

or via the URL go.gov.sg/epco-china,

b. Make the necessary adjustments to the approved PCO and

c. Submit the e-PCO to China.

The detailed step-by-step guide to perform the electronic transmission can be found in the

Handbook on the Transmission and Receipt of Electronic Preferential Certificate of Origin to and

from China via Customs eServices under the Rules of Origin segment on the Customs website.

Page 1 of 8

Procedures for retrieving e-PCO for Import into Singapore

5 Similarly, with effect from 11 December 2025, apart from exporters, importers who wish to

claim preferential treatment for import of goods from China to Singapore or to apply for a Back-to-

Back PCO under RCEP will also be able to retrieve the e-PCO issued by China

via www.customs.gov.sg > eServices > Search for “Electronic Preferential Certificate of Origin

transmitted to The People’s Republic of China” > Inbound Enquiry > Electronic Preferential

Certificate of Origin or via the URL go.gov.sg/epco-china. With the retrieved e-PCO from China,

Singapore importers can then use it to claim the preferential tariff treatment for goods imported

into Singapore. This can be done through emailing Singapore Customs at

customs_pref_doc@customs.gov.sg with the e-PCO reference number, the inward permit number,

commercial invoice and bill of lading / airway bill. Singapore importers can also use the retrieved

e-PCO from China to apply for a Back-to-Back PCO under RCEP.

Procedures regarding Certificate of Non-Manipulation (CNM) application

6 Please note that the submission of CNM should be done via via www.customs.gov.sg >

eServices > Search for “Certificate of Non-Manipulation (CNM)” or via the URL go.gov.sg/ecnm.

7 The applicant will receive an email notification once the application has been processed.

For successful applications, the applicant may retrieve the approved CNM via www.customs.gov.sg

eServices > Search for “Certificate of Non-Manipulation (CNM)” or via the URL go.gov.sg/ecnm.

8 For approved CNM with China as the country of final destination for the goods, they will be

transmitted electronically to China. For approved CNM with any other country/region as the

country/region of final destination for the goods, the applicant will have to retrieve the approved

CNM via the steps outlined in paragraph 7 above.

Payment Mode

9 The application fee will be $4.00 per application, and the fee shall be paid via the applicant’s

Inter-Bank GIRO (IBG) account. Non-IBG payment will no longer be available for CNM applications

from 1 Dec 2019. You will need to set up an IBG Account with Singapore Customs in order to make

payment for the CNM application. If you do not have an IBG account with Singapore Customs, we

encourage you to set up the IBG account as soon as possible to avoid any delay to the processing

of your CNM application

Clarification

10 You may refer to the Frequently Asked Questions (FAQ) in Annex A for more details. If you

require further clarification, you may contact us as follows:

Issues Contact Information

For login or technical issues with Customs 1. Live chat with our Customer Service Officer

eServices via https://go.gov.sg/customs-live-chat

Page 2 of 8

Feedback or enquiries related to "Choose 2. Contact the Customs Contact Centre at +65

your International Connectivity Services & 6355 2000

Authorise your Declaring Agent” form 3. Use our online enquiry form at

https://go.gov.sg/customs-doc to submit a

written enquiry or request a call-back from

a Customer Service Officer during the

Contact Centre’s operating hours

Technical issues with Customs eServices ICS ICS-Support@crimsonlogic.com

PCO Application Procedure Customs_ROO@customs.gov.sg

Yours faithfully

Wan Boon Oon

Head Tariffs and Trade Services

for Director-General of Customs

Singapore Customs

(This is a computer-generated circular. No signature is required.)

We hope that this circular has been written in a way that is clear to you. If not, please let us have suggestions on how

to improve this circular at customs_roo@customs.gov.sg.

Page 3 of 8

Annex A

FREQUENTLY ASKED QUESTIONS

Q1: What are the types of PCO that can be submitted or received with this new system?

A1: All PCO issued by Singapore Customs (i.e., under ACFTA, CSFTA and RCEP) on goods destined

for China could be submitted via EODES to GACC. Similarly, all PCOs issued by China (i.e., under

ACFTA, CSFTA and RCEP) on goods imported into Singapore could be retrieved via Customs

eServices.

Q2: How do I transmit the e-PCO for export to China if the EODES is down?

A2: In such exceptional circumstances, you may collect the hardcopy PCO at the printing centres

for despatch overseas.

Q3: As an exporter, do I need to register to transmit e-PCO for export to China via EODES?

A3: Exporter will automatically become a registered participant to transmit e-PCO via EODES. There

is no need for the exporter to be registered.

Q4: How do I remove declaring agent(s) that I no longer want to authorise?

A4: Exporter can log in to www.customs.gov.sg > eServices > Search for “Choose your International

Connectivity Services & Authorise your Declaring Agent to remove the authorisation” or via the

URL go.gov.sg/aut-da.

Q5: GACC did not receive the e-PCO transmitted via EODES. What should I do?

A5: Please write to customs_roo@customs.gov.sg with your company’s Unique Entity Number and

the PCO reference number. We will investigate the matter and get back to you.

Q6: If I want to make an amendment to the details of the e-PCO after transmission, am I allowed

to do so?

A6: You will not be able to make any amendments to the details of the e-PCO after you have

submitted to China. You will need to cancel the PCO as per current procedure, and re-apply for a

new PCO in TradeNet. Do note that only unutilised CO/PCOs can be cancelled. Thereafter you will

have to retrieve the approved new PCO on Customs eServices, undertake the necessary

adjustments and transmit the e-PCO to China.

Q7: How soon will GACC receive the approved e-PCO?

A7: In general, you will be able to retrieve the approved PCO record in Customs eServices within 1

hour from its approval in TradeNet. You can then undertake the necessary adjustments and submit

Page 4 of 8

the e-PCO over to GACC immediately via Customs eServices. GACC will receive the e-PCO in real-

time.

Q8: Will hardcopy Form RCEP still be available with the introduction of EODES under RCEP?

A8: Both CrimsonLogic Service Bureau and Singapore Air cargo Agents Association printing centres

will continue to provide their service to print the hardcopy PCOs until further notice is given.

Companies who wish to obtain the hardcopy PCOs for their own purposes can continue to collect

them at the printing centres.

Q9: Are there any changes to the requirements to qualify for the CNM?

A9: No. The requirements to qualify for a CNM remains unchanged.

A CNM is issued on the basis that the goods arrive from the country of origin (port of loading), does

not undergo any form of manipulation in Singapore and then are re-exported to the next

destination (country).

The main conditions for the issuance of a CNM is:

a) Goods specified must, when transhipped via Singapore, have not undergone operations beyond

ensuring their preservation in good condition for transport;

b) Goods specified must have been stored within the Free Trade Zone or in a Customs Licensed or

Zero GST (Bonded) Warehouse, prior to their export; and

c) The CNM application may be submitted by a local shipping/ freight forwarding agent up to the

third working day after the departure of the good.

Applicants to ensure that the CNM application is submitted within 3 working days after vessel

departure.

Please note that the submission of CNM should be done via www.customs.gov.sg > eServices >

Search for “Certificate of Non-Manipulation (CNM)” or via the URL go.gov.sg/ecnm.

Page 5 of 8

Circular No. 10/2025: IMPLEMENTATION OF ELECTRONIC ORIGIN DATA EXCHANGE SYSTEM

(EODES) BETWEEN SINGAPORE AND CHINA UNDER THE REGIONAL COMPREHENSIVE ECONOMIC

PARTNERSHIP (RCEP) (dated 5 Dec 2025)

Paragraph Current Details Updated Details Date of

Update

Title IMPLEMENTATION OF IMPLEMENTATION OF ELECTRONIC ORIGIN 26 June

ELECTRONIC ORIGIN DATA DATA EXCHANGE SYSTEM (EODES) BETWEEN 2026

EXCHANGE SYSTEM (EODES) SINGAPORE AND CHINA UNDER THE

BETWEEN SINGAPORE AND REGIONAL COMPREHENSIVE ECONOMIC

CHINA UNDER THE PARTNERSHIP (RCEP) AND THE APPLICATION

REGIONAL COMPREHENSIVE FOR CERTIFICATE OF NON-MANIPULATION

ECONOMIC PARTNERSHIP (CNM) ON CUSTOMS E SERVICES

(RCEP)

4 a. The exporter or its a. The exporter or its authorised declaring 26 June

authorised declaring agent(s) can retrieve the approved PCO 2026

agent(s) can retrieve the via www.customs.gov.sg > eServices >

approved PCO in Search for “Electronic Preferential

www.ntp.gov.sg > Certificate of Origin transmitted to The

Government Services > People’s Republic of China” > Outbound

Electronic Preferential enquiry > Submit SG PCO or via the URL

Certificate of Origin go.gov.sg/epco-china

transmitted to The People’s

Republic of China

Outbound enquiry >

Submit SG PCO

5 Similarly, with effect from 11 Similarly, with effect from 11 December 26 June

December 2025, apart from 2025, apart from exporters, importers who 2026

exporters, importers who wish to claim preferential treatment for

wish to claim preferential import of goods from China to Singapore or

treatment for import of to apply for a Back-to-Back PCO under RCEP

goods from China to will also be able to retrieve the e-PCO issued

Singapore or to apply for a by China via www.customs.gov.sg >

Back-to-Back PCO under RCEP eServices > Search for “Electronic Preferential

Certificate of Origin transmitted to The

will also be able to retrieve

People’s Republic of China” > Inbound

the e-PCO issued by China via

Enquiry > Electronic Preferential Certificate of

www.ntp.gov.sg >

Origin or via the URL go.gov.sg/epco-china.

Government Services >

Electronic Preferential

Certificate of Origin

transmitted to The People’s

Republic of China

Inbound Enquiry >

Electronic Preferential

Certificate of Origin.

Page 6 of 8

6 - Please note that the submission of CNM 26 June

should be done via www.customs.gov.sg > 2026

eServices > Search for “Certificate of Non-

Manipulation (CNM)” or via the URL

go.gov.sg/ecnm

7 - The applicant will receive an email 26 June

notification once the application has been 2026

processed. For successful applications, the

applicant may retrieve the approved CNM via

www.customs.gov.sg > eServices > Search for

“Certificate of Non-Manipulation (CNM)” or

via the URL go.gov.sg/ecnm

8 - For approved CNM with China as the country 26 June

of final destination for the goods, they will be 2026

transmitted electronically to China. For

approved CNM with any other

country/region as the country/region of final

destination for the goods, the applicant will

have to retrieve the approved CNM via the

steps outlined in paragraph 7 above.

9 - The application fee will be $4.00 per 26 June

application and the fee shall be paid via the 2026

applicant’s Inter-Bank GIRO (IBG) account.

Non-IBG payment will no longer be available

for CNM applications from 1 Dec 2019. You

will need to set up an IBG Account with

Singapore Customs in order to make payment

for the CNM application. If you do not have

an IBG account with Singapore Customs, we

encourage you to set up the IBG account as

soon as possible to avoid any delay to the

processing of your CNM application.

10 Setting up of NTP Account or For login or technical issues with Customs 26 June

technical support in using eServices 2026

the NTP

A1 NTP Customs eServices 26 June

(Annex A) 2026

A4 www.ntp.gov.sg www.customs.gov.sg 26 June

(Annex A) 2026

Page 7 of 8

A6 NTP Customs eServices 26 June

(Annex A) 2026

A7 NTP Customs eServices 26 June

(Annex A) 2026

Q9 - Q9: Are there any changes to the 26 June

(Annex A) requirements to qualify for the CNM? 2026

A9 - A9: No. The requirements to qualify for a 26 June

(Annex A) CNM remains unchanged. 2026

A CNM is issued on the basis that the goods

arrive from the country of origin (port of

loading), does not undergo any form of

manipulation in Singapore and then are re-

exported to the next destination (country).

The main conditions for the issuance of a

CNM is:

a) Goods specified must, when transhipped

via Singapore, have not undergone

operations beyond ensuring their

b) Goods specified must have been stored

within the Free Trade Zone or in a Customs

Licensed or Zero GST (Bonded) Warehouse,

prior to their export; and

c) The CNM application may be submitted by

a local shipping/ freight forwarding agent up

to the third working day after the departure

of the good.

Applicants to ensure that the CNM

application is submitted within 3 working

days after vessel departure.

Please note that the submission of CNM

should be done via www.customs.gov.sg >

eServices > Search for “Certificate of Non-

Manipulation (CNM)” or via the URL

go.gov.sg/ecnm.

Page 8 of 8

IssuesContact Information
For login or technical issues with Customs eServices1. Live chat with our Customer Service Officer via https://go.gov.sg/c…
Feedback or enquiries related to "Choose your International Connectivi…2. Contact the Customs Contact Centre at +65 6355 2000 3. Use our onli…
Technical issues with Customs eServices ICSICS-Support@crimsonlogic.com
PCO Application ProcedureCustoms_ROO@customs.gov.sg
Circular No. 10/2025: IMPLEMENTATION OF ELECTRONIC ORIGIN DATA EXCHANG…
ParagraphCurrent DetailsUpdated DetailsDate of Update
TitleIMPLEMENTATION OF ELECTRONIC ORIGIN DATA EXCHANGE SYSTEM (EODES) BETWE…IMPLEMENTATION OF ELECTRONIC ORIGIN DATA EXCHANGE SYSTEM (EODES) BETWE…26 June 2026
4a. The exporter or its authorised declaring agent(s) can retrieve the …a. The exporter or its authorised declaring agent(s) can retrieve the …26 June 2026
5Similarly, with effect from 11Similarly, with effect from 11 December 2025, apart from exporters, im…26 June 2026
December 2025, apart from
exporters, importers who
wish to claim preferential
treatment for import of
goods from China to
Singapore or to apply for a
Back-to-Back PCO under RCEP
will also be able to retrieve
the e-PCO issued by China via
www.ntp.gov.sg >
Government Services >
Electronic Preferential
Certificate of Origin
transmitted to The People’s
Republic of China
> Inbound Enquiry >
Electronic Preferential
Certificate of Origin.
6-Please note that the submission of CNM should be done via www.customs.…26 June 2026
7-The applicant will receive an email notification once the application …26 June 2026
8-For approved CNM with China as the country of final destination for th…26 June 2026
9-The application fee will be $4.00 per application and the fee shall be…26 June 2026
10Setting up of NTP Account or technical support in using the NTPFor login or technical issues with Customs eServices26 June 2026
A1 (Annex A)NTPCustoms eServices26 June 2026
A4 (Annex A)www.ntp.gov.sgwww.customs.gov.sg26 June 2026
A7 (Annex A)NTPCustoms eServices26 June 2026
Q9 (Annex A)-Q9: Are there any changes to the requirements to qualify for the CNM?26 June 2026
A9 (Annex A)-A9: No. The requirements to qualify for a CNM remains unchanged. A CNM…26 June 2026
§
免责声明:以上内容通过公开渠道搜集整理,仅供业界参考与内部交流使用,不构成任何形式的商业决策指导或法律建议;实际执行标准请以官方机构发布的最新原文及主管部门解释为准。 摘要、条款解读与影响分析内容由 AI 辅助生成,仅供参考,不构成法律意见;原文更新后解读将同步重新生成。