实时快讯
政策法规 现行有效新加坡海运规则

PORT MARINE CIRCULAR NO. 07 OF 2011 REVISION TO THE "GATE SYSTEM" FOR LICENSING OF PORT LIMIT BUNKER TANKERS

效力法规类型发布日期生效日期发文机构
现行有效规范性文件2011-11-092011-11-09Maritime and Port Authority of Singapore (MPA)
发布11-09
生效11-09
摘要总结AI 辅助解读
新加坡海事及港务管理局(MPA)发布2011年第7号港口通告,修订港内加油船牌照“准入制度”。核心变更包括:自2012年1月1日起,600载重吨及以上的新申请加油船船龄须小于10年;自2014年1月1日起,30年及以上船龄的加油船将被禁止在新加坡港运营。此举旨在通过强制船队更新降低污染风险并符合绿色航运趋势。原2008年第3号通告将于2012年1月1日废止。
官方原文
外文原文 · 可AI翻译 · 可溯源

MARITIME AND PORT AUTHORITY OF SINGAPORE

PORT MARINE CIRCULAR

NO. 07 of 2011

09 Nov 2011

Shipping Community

Bunker Suppliers / Bunker Craft Owners and Operators

REVISION TO THE “GATE SYSTEM” FOR LICENSING OF PORT LIMIT BUNKER

TANKERS

The “Gate System” for licensing of port limit bunker tankers was implemented

on 1 Jan 2005. It underscores Singapore’s efforts in minimizing the risk of marine

pollution by setting age limits and other conditions for the issuance of new Harbour

Craft Licence for Bunkering. Over the years, the “Gate System” has been reviewed

as an instrumental tool in MPA’s drive towards maintaining a young, efficient and

environmentally-friendly fleet of bunker tankers operating in the Port of Singapore.

This is especially important as the international maritime community moves towards

lower emission limits and green shipping.

2 In our continual efforts towards fleet renewal to safeguard the environment,

MPA will enhance the “Gate System” for licensing of port limit bunker tankers by

imposing an entry age limit of less than 10 years for vessels 600 DWT and above

with effect from 1 January 2012. In addition, with effect from 1 January 2014, port

limit bunker tankers of 30 years old and above will not be allowed to operate in the

Port of Singapore. These new requirements will better manage the navigational,

operational and environmental risks within the port.

3 The details of the revised “Gate System” for licensing of port limit bunker

tankers are illustrated in Appendix 1.

4 All bunker craft owners and operators are to ensure that their bunker tankers

adhere to the Standards for Port Limit Bunker Tankers and the requirements of the

“Gate System”. Please contact our officers at 6375 1959 or 6375 1953 if you need

any clarification.

1

5 The Port Marine Circular No. 3 of 2008 will be cancelled with effect from 1 Jan

2012.

M SEGAR

for CHIEF EXECUTIVE

MARITIME AND PORT AUTHORITY OF SINGAPORE

2

Appendix 1

REVISED “GATE SYSTEM” FOR LICENSING OF PORT LIMIT BUNKER

TANKERS

DWT of Tanker Existing New

Harbour Craft Licence Harbour Craft Licence

(Bunker Tanker) (Bunker Tanker)

Below 600  Non double-hulled bunker Less than 5 years old

DWT tankers of 25 years and above

will not be allowed to carry

600 DWT &  Less than 10 years old

HGO in port.

above (with effect from 1 Jan 2012)

 Bunker tankers of 30 years

 Subject to and comply with all

and above will not be allowed

MARPOL requirements, in

to operate in port.

particular:

(with effect from 1 Jan 2014)

 Regulation 19 of MARPOL

Annex I

 Regulation 13 of MARPOL

Annex VI

Footnote:

 Regulation 19 of MARPOL Annex I sets double hull and double bottom

requirements for oil tankers delivered on or after 6 Jul 1996.

 Regulation 13 of MARPOL Annex VI sets requirements for the control of NOx

emissions from ships – diesel engine with a power output of more than 130

kW installed on a ship constructed, or which undergoes a major conversion,

on or after 1 Jan 2000.

3

§
免责声明:以上内容通过公开渠道搜集整理,仅供业界参考与内部交流使用,不构成任何形式的商业决策指导或法律建议;实际执行标准请以官方机构发布的最新原文及主管部门解释为准。 摘要、条款解读与影响分析内容由 AI 辅助生成,仅供参考,不构成法律意见;原文更新后解读将同步重新生成。